logo
JC Elite
Member ID 159573
2年
银牌活跃会员
商育期

ASCO FREIGHT MANAGEMENT LIMITED

logo

Global Logistics and Materials Management

  • JC Elite
  • JC Projects
服务范围
View All
合作案例
caseStudy

Heavy lifts and global supply chain management for Norwegian offshore redevelopment project

<p>A major offshore redevelopment project in the Norwegian sector required a logistics partner capable of handling heavy lifts, oversized cargo, and a global supply chain spanning Europe, Scandinavia, and the United States. The work scope centred on the construction of a new production and accommodation platform and involved coordinating thousands of tonnes of specialist materials across multiple fabrication sites, including partial builds that had to be delivered in precise sequence. With tight schedules and high safety expectations, the client needed full assurance that every movement would be controlled, compliant, and executed without incident.</p><p><br></p><p><strong>At a glance</strong></p><ul><li>Managed the movement of 8,500 tonnes of heavy and oversized cargo across Europe, Scandinavia, and the US, including a world-record lift, for a major Norwegian offshore redevelopment project.</li><li>Delivered end-to-end supply chain coordination with zero injuries and 65,000 incident-free man-hours, ensuring full safety and compliance.</li><li>Achieved 2.8 million GBP in cost savings through strategic planning, freight consolidation, and seamless multi-site module integration.</li></ul><p><br></p><p><strong>Approach</strong></p><p>We delivered a hands-on, end-to-end freight management solution, centralising project coordination with specialist forwarders experienced in high-risk, large-scale logistics. Every freight type, from general cargo to abnormal loads and heavy lifts, was managed across multiple sites and stages of fabrication. Flexible, multi-stage planning allowed partially completed modules to be integrated into larger assemblies seamlessly. Safety and compliance were embedded at every step, ensuring operations ran smoothly and without incident. Our approach combined global supply chain integration with real-time operational management, adapting to the complexities of the build process while maintaining efficiency, control, and on-time delivery.</p><p><br></p><p><strong>Impact</strong></p><p>The operation achieved:</p><ul><li>8,500 tonnes of cargo delivered on schedule, including a world-record lift.</li><li>Zero injuries and 65,000 incident-free man-hours in the final phase.</li><li>2.8 million GBP in cost savings through smart planning and freight consolidation.</li><li>Seamless coordination across Europe, Scandinavia, and the US.</li><li>This project demonstrated our ability to manage technically demanding, high-profile logistics projects with precision, safety, and cost efficiency, reinforcing our reputation as a trusted lead logistics provider.</li></ul>

散杂
caseStudy

South Korean shipyard to Corpus Christi site: Full lifecycle logistics for three major platforms

<p>A major offshore operator had suffered a costly logistics failure when electrical cabinets were left outside a shipyard in South Korea by a previous supplier, resulting in $10 million of losses. To prevent a repeat, we were appointed as Lead Logistics Provider for three offshore platforms destined for the Gulf of Mexico. Our mission was to ensure all components arrived safely, on time, and without disruption to project delivery.</p><p><br></p><p><strong>At a glance</strong></p><ul><li>End-to-end control of a complex, multi-location supply chain from South Korea to the Gulf of Mexico.</li><li>Embedded oversight and disciplined risk management kept materials protected, accounted for, and on schedule.</li><li>Integrated freight and logistics partners delivered reliable, disruption-free execution across all three platform projects.</li></ul><p><br></p><p><strong>Approach</strong></p><p>We managed the full supply chain from source to site. Personnel were embedded at critical locations, including the South Korean shipyard and Corpus Christi assembly facility, providing direct oversight of materials and activities. We coordinated inventory, transportation, warehousing, and distribution, integrating in-house freight services with trusted third-party logistics partners.</p><p><br></p><p>Every logistical decision was guided by strategic planning and proactive risk management. With route optimisation, demand forecasting, and contingency plans for weather, geopolitical, and supplier risks, combined with real-time tracking, the project stayed on schedule and within budget.</p><p><br></p><p><strong>Impact</strong></p><p>Our logistics management delivered measurable benefits:</p><p><br></p><ul><li>Prevented costly losses by ensuring careful handling and full control of all materials</li><li>Streamlined operations through integrated, end-to-end supply chain management</li><li>Reliable delivery with rapid issue resolution maintaining the overall project schedule</li><li>Optimised resource use by coordinating in-house and third-party logistics efficiently</li></ul><p> </p><p>With ASCO fully responsible for logistics, the client could focus entirely on platform construction. Our strategic oversight, rigorous control, and multi-location coordination delivered a smooth, efficient logistics operation, setting a benchmark for future offshore projects.</p>

多式联运
公司介绍

Basic Information

iconLocation

阿伯丁,英国

iconAddress

Unit A, D2 Business Park 11 Harvest Ave., AB21 0BQ Aberdeen, United Kingdom

iconEstablishment time

7-Dec-1999

iconEnterprise Size

101以上

iconWebsite

https://www.ascoworld.com/

会员证书
ASCO FREIGHT MANAGEMENT LIMITEDJC ProjectscertificateBanner
ASCO FREIGHT MANAGEMENT LIMITEDJC ElitecertificateBanner
联系我们